What the canton of Appenzell Outer Rhodes pays
| Building work | Cantonal assistance | Main conditions |
|---|---|---|
| Air-to-water heat pump | CHF 4,850 up to 12.5 kW, then CHF 4,100 + CHF 60 per kW | From 2027 |
| Ground-source heat pump | CHF 10,000 up to 12.5 kW, then CHF 7,750 + CHF 180 per kW | From 2027 |
| Connection to a district heating scheme | CHF 6,750 up to 12.5 kW | From 2027 |
| Wood-fired heating (logs) | CHF 5,500 | From 2027 |
| Insulation (roof, walls, floor) | CHF 50 per m², at least 60 m² | Building completed before 2000 |
| Solar panel bonus with insulation | +40 to +100 CHF per m² | Depending on the angle |
| Full building envelope bonus | + 30 CHF per m² | At least 90 per cent of the façade and roof |
| Solar thermal | 3,000 CHF + 500 CHF per kW | Up to 70 kW |
Source: Canton of Appenzell Outer Rhodes — Energy Programme (decision of June 2026).

Good to know:
- These amounts are those of the new programme approved by the government in June 2026, which will apply from 1 January 2027 at the earliest. For an application in 2026, please check the current scale with the canton.
Municipality grants
Herisau and other municipalities may offer additional support. To find out what support is available in your local area, search using your postcode on francsenergie.ch (energiefranken.ch in German).
A simple example
A 200 m² house heated by oil carries out the following work:
- 10 kW air-to-water heat pump: CHF 4,850;
- insulation of 120 m² of façade and roof: approximately CHF 6,000 (at the basic rate);
Estimated total: around CHF 10,850 in cantonal grants, plus any grants from the municipality and tax relief.
Steps to follow in order
- Obtain a CECB Plus (GEAK Plus in German-speaking Switzerland) if you are planning several improvements: this will set out the order in which the work should be carried out.
- Request quotes from local tradespeople.
- Submit your application via the canton’s Building Programme platform and to your municipality before work begins.
- Wait for confirmation before starting.
- Carry out the work within the timeframe specified in the grant approval letter.
- Send the supporting documents (invoices, photos, certificates) to receive the grant.