What the canton of Glarus pays
| Building work | Cantonal assistance | Main conditions |
|---|---|---|
| Air-to-water heat pump | CHF 4,000 up to 70 kW | — |
| Ground-source heat pump | CHF 6,000 + CHF 250 per kW | Up to 70 kW |
| Connection to a district heating system | CHF 6,000 + CHF 20 per kW | — |
| Automatic wood-fired heating | CHF 6,000 + CHF 200 per kW | — |
| Initial radiators | CHF 15,000 for up to 250 m² | — |
| Insulation (roof, walls, floor) | CHF 90 per m², 25 per cent more in southern Glarus | U-value of 0.20 or better |
| Windows | CHF 90 per m² | Only in conjunction with insulation of the surrounding walls |
| Comprehensive renovation bonus | + 30 CHF per m² | At least 90 per cent of the building envelope |
| GEAK Plus | 1,200 CHF | — |
| Energy support | 2,000 CHF | Complete renovation |
| Windows and heating bonus | 4,000 CHF | Replaced at the same time |
Source: Canton of Glarus — 2026 Incentive Scheme leaflet.

Good to know:
- Glarus offers the highest insulation grant in Switzerland: 90 CHF per m², and even more in Southern Glarus.
Municipality grants
The three Glarus municipalities may supplement these grants. To find out about grants available in your municipality, search using your postcode on francsenergie.ch (energiefranken.ch in German).
A simple example
A 200 m² house heated by oil carries out the following work:
- a 10 kW air-to-water heat pump: CHF 4,000;
- insulation of 120 m² of façade and roof: approximately CHF 10,800 (at the basic rate);
- CECB Plus assessment prior to the work: CHF 1,200;
Estimated total: approximately 16,000 CHF in cantonal funding, plus any funding from the municipality and the tax deduction.
Steps to follow in order
- Obtain a CECB Plus (GEAK Plus in German-speaking Switzerland) if you are planning several improvements: this will set out the order in which the work should be carried out.
- Request quotes from local tradespeople.
- Submit your application via the canton’s Building Programme platform and to your municipality before work begins.
- Wait for confirmation before starting.
- Carry out the work within the timeframe specified in the grant approval letter.
- Send the supporting documents (invoices, photos, certificates) to receive the grant.