What the canton of Solothurn pays
| Works | Cantonal assistance | Main conditions |
|---|---|---|
| Air-to-water heat pump | CHF 3,550 up to 15 kW, then CHF 1,100 + CHF 150 per kW | Up to 70 kW |
| Geothermal heat pump | CHF 6,000 + CHF 450 per kW | Up to 70 kW |
| Connection to a district heating system | CHF 12,000 + CHF 60 per kW | Up to 70 kW |
| Wood-fired heating (pellets with storage tank) | CHF 3,000, plus CHF 2,000 for the first radiators | — |
| Insulation | CHF 40 per m² | Excluding windows |
| Combined roof and façade bonus | + 40 CHF per m² | — |
| Replacement of an electric or individual-floor heating system | 15,000 CHF up to 250 m² | — |
| Solar thermal | CHF 1,800 + CHF 750 per kW | From 2 kW |
| GEAK Plus | 50 per cent of the cost, up to a maximum of 1,100 CHF for a house | — |
Source: Canton of Solothurn — Energy Incentive Programme.

Good to know:
- The canton provides an official calculator at rechner.dasgebaeudeprogramm.ch/so.
Municipality grants
Solothurn, Olten and other municipalities offer additional grants, particularly for solar energy. To find out what support is available in your municipality, search using your postcode on francsenergie.ch (energiefranken.ch in German).
A simple example
A 200 m² house heated by oil carries out the following work:
- 10 kW air-to-water heat pump: CHF 3,550;
- insulation of 120 m² of façade and roof: approximately CHF 4,800 (at the basic rate);
- CECB Plus assessment prior to the work: CHF 1,100;
Estimated total: approximately CHF 9,450 in cantonal funding, plus any funding from the municipality and the tax deduction.
Steps to follow in order
- Obtain a CECB Plus (GEAK Plus in German-speaking Switzerland) if you are planning several improvements: this will set out the order in which the work should be carried out.
- Request quotes from local tradespeople.
- Submit your application via the canton’s Building Programme platform and to your municipality before work begins.
- Wait for confirmation before starting.
- Carry out the work within the timeframe specified in the grant approval letter.
- Send the supporting documents (invoices, photos, certificates) to receive the grant.

