Grants · German-speaking Switzerland

Subsidies in the canton of Schwyz: amounts and application procedures (2026)

Heat pumps, insulation, solar energy, CECB Plus: financial assistance from the canton of Schwyz, financial assistance from municipalities and a calculator to estimate your grant.

Last updated on 3 November 2026 · Reading time: 2 mins · By the RenovSwiss team

Illustration of a house with a heat pump, Canton of Schwyz

The canton of Schwyz supports the replacement of fossil fuel and electric heating systems, the insulation of buildings and other energy-saving measures through the Buildings Programme. Example: a 10 kW air-to-water heat pump in a house receives CHF 4,400 from the canton. Applications must always be submitted before work begins.

Source of figures : Programme 2026 (January 2026).

In brief

  1. The canton provides the bulk of the funding; many municipalities contribute additional funding.
  2. Submit your application before the work begins, via your canton’s ‘Programme Bâtiments’ platform.
  3. Energy-saving works are also tax-deductible.

Estimate your grant in 1 minute

Estimate of financial assistance from the canton5'400 CHF
  • Air-to-water heat pump 4'400 CHF
  • CECB Plus 1'000 CHF

Estimate based on the scale shown on this page. Maximum power taken into account: 50 W per m² of heated floor area. Local authority grants are often available in addition. The exact amount is confirmed by the canton.

What the canton of Schwyz pays

Building work Cantonal assistance Main conditions
Air-to-water heat pump CHF 3,200 + CHF 120 per kW Replaces a fossil fuel or electric heating system
Ground-source heat pump CHF 4,800 + CHF 360 per kW Same as above
Connection to a district heating system CHF 4,000 + CHF 200 per kW At least 75 per cent renewable
Wood-fired heating (logs, pellets) CHF 5,000 —
Insulation CHF 60 per m², at least CHF 3,000 Building granted planning permission before 2000
Facade and roof bonus + 40 CHF per m² At least 90 per cent insulated
Replacement of an electric or individual-floor heating system Up to 15,000 CHF —
Solar thermal CHF 2,400 + CHF 1,000 per kW —
GEAK Plus CHF 1,000 (house), CHF 1,500 (other properties) —
Minergie renovation, house CHF 100 per m² Building granted planning permission before 2000

Source: Canton of Schwyz — Energy Incentive Programme 2026.

Subsidy from the canton of Schwyz for a 10 kW heat pump
Subsidy from the Canton of Schwyz for a 10 kW heat pump

Good to know:

  • Applications must be made online and in writing to the Energy Department.

Municipality grants

Several municipalities in Schwyz offer their own financial support schemes. To find out what support is available in your municipality, search using your postcode on francsenergie.ch (energiefranken.ch in German).

A simple example

A 200 m² house heated by oil carries out the following work:

  • 10 kW air-to-water heat pump: CHF 4,400;
  • insulation of 120 m² of façade and roof: approximately CHF 7,200 (at the basic rate);
  • CECB Plus assessment prior to the work: CHF 1,000;

Estimated total: approximately CHF 12,600 in cantonal funding, plus any funding from the municipality and the tax deduction.

Steps to follow in order

  1. Obtain a CECB Plus (GEAK Plus in German-speaking Switzerland) if you are planning several improvements: this will set out the order in which the work should be carried out.
  2. Request quotes from local tradespeople.
  3. Submit your application via the canton’s Building Programme platform and to your municipality before work begins.
  4. Wait for confirmation before starting.
  5. Carry out the work within the timeframe specified in the grant approval letter.
  6. Send the supporting documents (invoices, photos, certificates) to receive the grant.
The 6 steps to obtaining a grant
The 6 steps to obtaining a grant

Frequently Asked Questions

Will the amounts change in 2027?

The cantons generally publish their new fee scales at the end of the year. This page will be updated as soon as they are published.

Can I claim both cantonal and municipal assistance?

Often yes, but each grant scheme has its own conditions, and some municipalities deduct the cantonal grant. Check both before signing.

What about solar panels?

Photovoltaics are primarily supported by the Confederation, through Pronovo’s one-off feed-in tariff, which is claimed after the system is commissioned. Some cantons and municipalities offer an additional bonus.

What happens if I start the work too early?

Generally speaking, the help section is not very useful. Always wait for written confirmation before making a purchase or starting work.

Find a tradesperson who is familiar with the grants available in your canton

Describe your project in 2 minutes and receive quotes from tradespeople in your area. 100% free from now on, with no obligation.

Post my project

Official sources

Last updated on 3 November 2026