In Switzerland, a qualified bricklayer generally charges between 70 and 90 CHF per hour. Prices vary considerably depending on the work: a few dozen francs per m² for a partition wall, and several thousand francs to knock through a load-bearing wall. Here are the approximate costs for the most common jobs.

How much does a bricklayer cost in Switzerland?

Interior

Work Approximate price
Labour costs for a qualified bricklayer approx. 70 to 90 CHF/h
Opening in a load-bearing wall (approx. 5 m²) approx. 7,500 to 15,000 CHF, including engineering survey
Non-load-bearing partition approx. 20 to 25 CHF/m²
Load-bearing wall (up to 30 cm thick) approx. 550 to 600 CHF/m³
Interior render approx. 25 to 40 CHF/m²
Basement waterproofing (detached house) approx. 2,000 to 5,000 CHF, plus joints charged per metre

Exterior

Work Guide price
Scaffolding approx. 10 to 25 CHF per square metre of façade
Minor plaster repairs approx. 50 CHF/m²
New façade render approx. 50 to 150 CHF/m²
Natural stone wall approx. 200 to 250 CHF/m², plus labour
Concrete low wall approx. 500 CHF/m² (a 6 m × 1 m low wall ≈ 3,000 CHF)
Garden path (foundation and paving slabs) approx. 80 to 120 CHF/m², excluding labour
Extension approx. 3,000 to 4,000 CHF/m²

Source: indicative prices published by Houzy in 2023. Prices may have changed since then and vary depending on the canton, town and site access: only quotes are binding.

Indicative prices per m² for common masonry work in Switzerland
Indicative prices per m² for common masonry work in Switzerland

Opening up a load-bearing wall: the rules to follow

A load-bearing wall supports the floors or the roof. Altering it without taking the necessary precautions can compromise the stability of the entire building.

  1. Consult a structural engineer: they will calculate the required beam or lintel.
  2. Apply for planning permission: depending on the canton and the scale of the work, a permit from the municipality may be required. In condominium ownership (PPE), the owners’ association’s consent is essential, as load-bearing walls are considered common areas.
  3. Shore up the ceiling whilst the work is being carried out.
  4. Install the beam, then open up the wall.
  5. Restore the finishes: render, paint and flooring.
The 5 steps to safely cut through a load-bearing wall
The 5 steps to safely opening up a load-bearing wall
Tip

Don’t rely on the thickness of a wall to determine whether it is load-bearing. Only the building plans or a structural engineer can confirm this.

External work

  • Low walls and retaining walls: a retaining wall that holds back earth requires foundations and drainage; above a certain height, an engineer is often required.
  • Terraces and driveways: the cost depends mainly on the surfacing. Concrete slabs and paving stones are the cheapest, whilst natural stone is the most expensive.
  • Facade render: this needs to be redone when it cracks or crumbles; ideally at the same time as installing external insulation to make shared use of the scaffolding.

Do you need planning permission?

Often yes, for work affecting the structure, the façade or the external appearance: opening up a load-bearing wall, extensions, walls on the property boundary, or a garage. The rules depend on your municipality and canton: check before signing the quote.

Beware of asbestos

In buildings constructed or renovated before 1990, render, adhesives and certain building materials may contain asbestos. Have a test carried out before demolition (Suva).

Frequently Asked Questions

How can you tell if a wall is load-bearing?

Check the building plans or ask a civil engineer. The thickness or the sound of a wall is not enough to tell.

Can you knock down a partition wall yourself?

A non-load-bearing partition wall can be dismantled without significant risk, provided the electricity has been switched off and you have checked that no pipes or cables run through it. If in doubt, have it checked.

How long does it take to open up a load-bearing wall?

The work itself often takes a few days, but the engineering survey and any necessary planning permission can take several weeks.

What’s the best time of year for outdoor work?

Concrete and render do not cope well with either frost or extreme heat. Spring and autumn are often the best times of year.

How do I compare quotes for bricklaying work?

Please check that each quote includes labour, materials, travel costs, rubble removal, scaffolding where necessary, and the rate for overtime.

Find a tradesperson near you

Describe your project in 2 minutes and receive free quotes from tradespeople in your area. 100% free right now, with no obligation.

  1. 1. Describe your project in 2 minutes
  2. 2. Tradespeople in your area will get back to you
  3. 3. You can compare and choose freely
Get free quotes

Still not sure?

Contact the RenovSwiss team: we’ll guide you and help you make the right choice for your project.

Contact our team